Regional Architecture Banner
Home
Scope
Stakeholders
Inventory
By Entity
By Stakeholder
Services
Ops Concept
Functions
arrowInterfaces
Standards
Related Links
Documentation
 
E-Mail

Send Comments

Interface: Provincial Emergency Preparedness Centre To Provincial Ministry of Transport TMC

Provincial Emergency Preparedness Centre to Provincial Ministry of Transport TMC Interface Diagram

 

Architecture Flow Definitions

alert notification   (Planned)   Applicable ITS Standards

Notification of a major emergency such as a natural or man-made disaster, civil emergency, or child abduction for distribution to the public. The flow identifies the alert originator, the nature of the emergency, the geographic area affected by the emergency, the effective time period, and information and instructions necessary for the public to respond to the alert. This flow may also identify specific information that should not be released to the public.

 

alert status   (Planned)   Applicable ITS Standards

Information indicating the current status of the emergency alert including identification of the traveler and driver information systems that are being used to provide the alert.

 

emergency plan coordination   (Planned)   Applicable ITS Standards

Information that supports coordination of emergency management plans, continuity of operations plans, emergency response and recovery plans, evacuation plans, and other emergency plans between agencies. This includes general plans that are coordinated prior to an incident and shorter duration tactical plans that are prepared during an incident.

 

emergency traffic control information   (Planned)   Applicable ITS Standards

Status of a special traffic control strategy or system activation implemented in response to an emergency traffic control request, a request for emergency access routes, a request for evacuation, a request to activate closure systems, a request to employ driver information systems to support public safety objectives, or other special requests. Identifies the selected traffic control strategy and system control status.

 

emergency traffic control request   (Planned)   Applicable ITS Standards

Special request to preempt the current traffic control strategy in effect at one or more signalized intersections or highway segments, activate traffic control and closure systems such as gates and barriers, activate safeguard systems, or use driver information systems. For example, this flow can request all signals to red-flash, request a progression of traffic control preemptions along an emergency vehicle route, request a specific evacuation traffic control plan, request activation of a road closure barrier system, or place a public safety or emergency-related message on a dynamic message sign.

 

evacuation information   (Planned)   Applicable ITS Standards

Evacuation instructions and information including evacuation zones, evacuation times, and reentry times.

 

resource deployment status   (Planned)   Applicable ITS Standards

Status of traffic management resource deployment identifying the resources (vehicles, equipment, materials, and personnel) available and their current status. General resource inventory information and specific status of deployed resources may be included.

 

resource request   (Planned)   Applicable ITS Standards

A request for traffic management resources to implement special traffic control measures, assist in clean up, verify an incident, etc. The request may poll for resource availability or request pre-staging, staging, or immediate deployment of resources.

 

road network status assessment   (Planned)   Applicable ITS Standards

Assessment of damage sustained by the road network including location and extent of the damage, estimate of remaining capacity, required closures, alternate routes, necessary restrictions, and time frame for repair and recovery.

 

transportation system status   (Planned)   Applicable ITS Standards

Current status and condition of transportation infrastructure (e.g., tunnels, bridges, interchanges, TMC offices, maintenance facilities). In case of disaster or major incident, this flow provides an assessment of damage sustained by the surface transportation system including location and extent of the damage, estimate of remaining capacity and necessary restrictions, and time frame for repair and recovery.

 

Last Update: 01-29-2006